Plant Throughput Optimisation

Plant Throughput Optimisation KMK was requested by a major coal export terminal to review their existing wagon tippler system equipment for increasing the throughput capacity and system capability in line the new expansion. This included a site visit for equipment inspection, train track topography review, hand calculations, new plant time-cycle and running train [...]

By |2020-08-07T11:41:37+01:00August 4th, 2020|Bulk Material Handling, Recent Work|0 Comments

Train Simulation

Train Simulation KMK was tasked by a major coal handling exporter to review their newly installed car Dumper system for equipment acceptance by evaluating the current throughput capacity against the client’s original specification. This task included a site visit for equipment inspection, system control software. (PLC/HMI/SCADA) review, power requirement calculations, new plant time-cycle and [...]

By |2020-10-02T22:52:17+01:00August 4th, 2020|Bulk Material Handling, Recent Work|0 Comments

Spectator Grandstands

Spectator Grandstands KMK Consulting Engineers comprise of structural and mechanical engineers, project and site managers. The team has all the knowledge necessary to design, build and develop sports grandstand seating. KMK can guide developers and owners through all phases of the project. These phases will include: Working with architects on the initial design [...]

By |2020-10-04T09:11:28+01:00June 30th, 2020|Recent Work, Spectator Arena and Grandstands|0 Comments

Train Mover Design

Train Mover Design KMK was awarded a contract for designing an Indexer machine as part of a new Car Dumper system for 8000 tph (tonnes per hour) throughput. The Indexer machine was designed with the capacity of handling up to 152 wagons/cars (130 tonnes) with mid-train Loco (200 tonnes), capable of handling the train [...]

By |2020-10-08T16:34:19+01:00August 4th, 2020|Bulk Material Handling, Recent Work|0 Comments

Material Handling Site Inspection

Material Handling Site Inspection KMK was selected to provide services for full inspection of stockyard machines such as Stacker Reclaimers, bridge reclaimers and ship-loaders. This task included a site visit with detailed machine inspection followed by a comprehensive summary report. Evaluation of material handling equipment for remedial and or upgrade. Desktop pre-inspection study. Identifying [...]

By |2020-10-02T23:15:35+01:00July 28th, 2020|Mining and Processing, Recent Work|0 Comments

Electrical Substation House

Electrical Substation House KMK was part of a partnership with leading electrical specialist PSE2 company to supply a full turnkey product of an electrical substation house. KMK design and supply included a customised integrated housing/cabinet for the electrical substation circuit brakers. Individual internal equipment design layout to accommodate cable entry and termination efficiency. Fully [...]

By |2020-10-02T23:23:26+01:00July 30th, 2020|Electrical Substations, Recent Work|0 Comments

Wind Turbine and Renewable Design

Wind Turbine and Renewable Design KMK engineers were involved with design, fabrication, installation, and commissioning of 1.5MW two bladed wind turbine. The engineering work included structural analysis, equipment specification, fabrication and manufacturing detailed drawings with DNV certification. Power curve production Tower, nacelle and slew bearing certification Proprietary specification and selection including drive, generator, and [...]

By |2020-10-02T23:37:43+01:00July 30th, 2020|Recent Work, Renewable Energy|0 Comments

Process Plant Design and Analysis

Process Plant Design and Analysis KMK was tasked by a leading innovative company to provide structural analysis for wastewater purifying storage and tanks. This engineering work included review of 3D model, fabrication feasibility, hand calculations, finite element analysis (FEA) and material selection. Evaluation of product requirements, fully detailed process flow diagram. Plant equipment design [...]

By |2020-10-02T23:36:20+01:00July 30th, 2020|Mining and Processing, Recent Work|0 Comments

Crane Design and Structural Analysis

Crane Design and Structural Analysis KMK have been involved with various projects in different industries to design, evaluate, verification, repair, and replacement of automatic and semi-automatic crane (robotic) systems. These engineering projects involved site inspection for product suitability, structural analysis for product acceptance with detailed engineering drawings and documentation. Full crane usage and specification [...]

By |2020-10-02T23:30:54+01:00July 30th, 2020|Crane Design and Inspection, Recent Work|0 Comments